Site Progress Update For Our Newest Array

Posted in Uncategorized

Our latest project has been a doozy; its been one of our largest at 660 kW and the site has been a hard nut to crack with ledge and rock being a pervasive obstacle. Luckily, we’re equipped for the job. We’ve been using a pneumatic drill to bore into the ground to place our poles. It’s been quite a process but the results are turning out quite nicely.

 

Here are some pictures of the site as of Tuesday, courtesy of Higher Perspectives Dronography.

 

Screen Shot 2016-08-11 at 12.10.18 PM Screen Shot 2016-08-11 at 12.12.54 PM Screen Shot 2016-08-11 at 12.13.22 PM